Gulfstream

Complete design of a 29 story building: ETABS Model, ASCE-10 Wind analysis, Concrete shearwalls design, Concrete frame design, Post-tensioned slab design, SAFEA Pile foundation design, ASCE-10 Components and cladding design, Written construction specifications.

  Hallandale FL

   2017

 XXXXXXXXX